Rogell Drive Connector
Detroit Metropolitan Wayne County Airport, Romulus, MI
Tucker, Young, Jackson, Tull Inc. (TYJT) was one of two major subconsultants for the Rogell Drive Connector Project. The project included the design of the last piece of road to connect the Smith Access Road to the Rogell Drive. Work included the relocation of the major existing underground utilities and installation of 20-inch and 16-inch water mains items of work. The public utility relocations include electrical lines, storm water lines, and natural gas lines.
Project Highlights
Design-Bid-Build, Fast Track
The project was designed and built allowing for completion ahead of the opening of the New Midfield Terminal.
Status of Project: Completed and Under Operation - Since 2001